Creation of a hydraulically bound base layer, renovation of a unpaved road in the region of Gunung Mas/Kalimantan by using the NovoCrete® technology.
• Location: Gunung Mas/Indonesia
• Period of execution: November 2011
• Time needed: not yet finished
• Cement: 190 kg/m3 cement + 2 % NovoCrete
• Milling depth: 35 cm