Renovation of the unpaved link road between Ereke and Laeja in the region of North Buton/Sulawesi by using the NovoCrete® technology
• Location: Ereke/Indonesia
• Period of execution: September 2011
• Time needed: 5 days
• Cement: 190 kg/m3 + 2 % NovoCrete
• Milling depth: 30 cm